
Imprint the situations on the divider where the rack jolt is to be introduced for the wash bowl.
Drill an opening of 12mm in the divider utilizing a pneumatic mallet. Wipe out the penetrating residue.
Spot the nylon dowel in the bored opening.
Addition the jolts pointed side into the dowels and fix utilizing the spanner gave.
Request help to drape the bowl on the screws and verify whether enough string is accessible to affix the nuts and washers.
Position the bowl and addition the washers in the accompanying request : Flanged shrub - elastic washer - metal washer.
Daintily fix the nuts on both the screws and check for arrangement.
After a palatable arrangement is accomplished, attach the nuts and check for a safe fit.